SOTRA SEPEREF
See SOTRABAT product sheet
Company
Markets and products
Services
New
Downloads

News

BI-OROCŪ

18/07/2007

In order to enjoy the full benefits of BI-OROC®, certain rules must be complied with.
BI-OROC PN25 product sheet
BI-OROC PN16 product sheet

Like compact PVC products, most of the phases of BI-OROC® installation comply with the recommendations and guidelines of trade best practices.
(• Fascicule 71 • Technical guide to filling Setra/LCPC trenches)

    * Handling
    * Storage
    * Excavation
    * Filling
    * Alignment

Other stages have special features that should be known and complied with.

    * Cutting to length: use a suitable cutting disc (metal abrasive type).
    * Connections: refer to the table of pressure-tested connections as per standard XP T 54-948.
    * Takeover: use appropriate drill bits (cylinder saw, perforator type).


> See all news

BI-OROC®

To get the most from BI-OROC®, compliance with certain rules is essential.

BI-OROC PN 16 assembly table


Download

NF label certificates

Sanitary compliance documentation


Consult our interactive BTP (public works & civil engineering) catalogue

Can PE piping be installed overhead?